From £5.00
Shelf life: 15 months in unopened packaging in a cool and dry storage place at temperatures between +5°C and +25°C. Substrates
Substrates: all usual building substrates Nature: rigid, clean, dry, free of dust and grease. Surface preparation: Porous surfaces should be primed with Primer 150.
There is no adhesion on PE, PP, PTFE (Teflon®) and bituminous substrates.
We recommend a preliminary adhesion and compatibility test on every surface.
Compatibility with glass Silirub LMN is not suitable for contact with secondary sealant of insulating glass units.
Silirub LMN is not suitable for applications in direct contact with PVB films of laminated glass.
*All images on this website are subject to copyright. Please respect these rights and do not copy them.
Get Exclusive Access to New Products and Discounts Before Anyone Else – Sign up Today!
Use this form to send a message directly to our customer service team.